A managing agent received a fire risk assessment recommending a waking watch on a fourteen-storey block of 148 apartments pending completion of cladding remediation. The responsible person needed continuous, documented cover in place within days, not weeks, and a previous provider had already failed to mobilise.
The block had four stair cores, a mix of owner-occupiers and tenants, and an active works programme changing escape routes week to week. Residents needed clear communication about who was in the building and why, and the fire authority needed evidence that patrol intervals were actually being met.
How we mobilised and ran the contract
- 1Immediate mobilisationFire-trained wardens assigned and briefed on the fire risk assessment within 48 hours of instruction, with cover starting the same evening.
- 2Hourly floor sweepsDocumented sweeps of every floor and stair core each hour, checking escape routes, fire doors, and works areas against the current phasing.
- 3Resident communication protocolAgreed wording, notice boards, and a single point of contact so residents knew who the wardens were and how to raise a concern.
- 4Documented shift handoverWritten handover between every shift and nightly logs supplied to the responsible person and available to the fire authority on request.
Continuous compliant cover, evidenced shift by shift
They mobilised waking watch cover for us inside two days when another provider had already let us down. The nightly logs were exactly what our fire authority asked for.
The elements of this contract
Each service on this contract is available on its own or as part of a combined arrangement.
Similar work
- Reading, Berkshire
Combined guarding and daily cleaning for a corporate campus
Two contracts consolidated into one point of accountabilityRead the case studyOffices & Corporate - Glasgow
Crowd management for a 5,000-capacity two-day festival
Event ran to licence with no capacity or queue incidentsRead the case studyEvents & Venues - Central London
Loss prevention and front-of-house presence across four stores
Measurable reduction in recorded shrinkage across all four sitesRead the case studyRetail
Need advice for your own site?
Talk to us about security, cleaning, or facilities management. We’ll look at your site and tell you what it actually needs.